Template previewEvery dashed box is a field we need from David. Real photos are already in place.

Cabinet Refinishing, town pending

Project title pending

Project title

Plain description of the job in the homeowner's terms. For example, kitchen cabinets refinished in a 1998 two story.

One line summary

One sentence a stranger can understand. What the job was and what changed.

Service

Cabinet Refinishing

Town

The town this job was in. One of our 16 towns.

How long it took

Working days on site, start to walkthrough. Say it the way David would say it on the phone.

Total investment

The final figure David approves for publication. This is the number that makes the whole page work.

Crew who did it

First names of the crew on this job. For example Anthony and Nathan, with Chad managing.

The story

How this job actually went

Three parts. The middle one is the part nobody else publishes.

What they wanted

The homeowner's goal

In their own words if you have them. What they called us about, what was bothering them, what they pictured when it was done.

What we did

The work, step by step

How the crew handled it. Prep, protection, repairs, coats, order of operations, anything we changed on the fly.

What it cost

Cost summary in one line

One sentence tying the total to the scope. The itemized breakdown lives further down the page.

The part that makes this real

What we found

Water damage. Three layers of paper. A wall that was never primed. Whatever turned up once the work started belongs here, in plain language, including what it added to the price.

What turned up once we started

The surprises. What we found behind, under or inside the surface, how we told the homeowner, what it changed about the scope and the number.

Photos

Before, during, after

In that order, with the middle row given the same weight as the other two.

Before

Kitchen cabinets before refinishing

During

The part most companies do not show you.

Photo neededdoors removed and labeled

Photo neededsurfaces masked and protected

Photo neededspraying in progress

Photo neededreassembly and hardware

After

Kitchen cabinets after refinishing

Drag it yourself

Kitchen cabinets after
Kitchen cabinets before
BeforeAfter
Kitchen cabinets

The numbers

What this job cost, line by line

No ranges, no hedging. The total, then where it went.

Total investment

Pending David's approval

The published total for this job, exactly as the homeowner paid it. Large, in gold, and never behind a form.

Line itemAmount

Line item 1

What the work was. For example doors and drawer fronts sprayed, or boxes brushed and rolled.

Amount

Dollar amount for this line, from the approved invoice.

Line item 2

What the work was. For example doors and drawer fronts sprayed, or boxes brushed and rolled.

Amount

Dollar amount for this line, from the approved invoice.

Line item 3

What the work was. For example doors and drawer fronts sprayed, or boxes brushed and rolled.

Amount

Dollar amount for this line, from the approved invoice.

Line item 4

What the work was. For example doors and drawer fronts sprayed, or boxes brushed and rolled.

Amount

Dollar amount for this line, from the approved invoice.

Why it cost what it did

Three or four bullets tying the total to real drivers. Door and drawer count, grease baked into the old finish, an extra coat, a repair nobody could see from the driveway.

Cost driver 1

Driver one. For example the door, drawer, face, handle and hinge count on this kitchen.

Cost driver 2

Driver two. For example how much degreasing and sanding the old finish took.

Cost driver 3

Driver three. For example an extra coat, or a repair we found once we opened it up.

Cost driver 4

Driver four, if there is one. Optional.

Every job has its own number. Yours will not match this one, but you can get close in about a minute. Our project minimum is $450.

Price a project like this one

Straight talk

What was tricky

What went sideways, what we would do differently, what we learned. Left in on purpose.

What went sideways

The problem we hit and how we handled it. Do not skip this. It is the most believable part of the page.

In the homeowner's words

What they said when it was done

Pull quote and attribution

One or two sentences from the homeowner, word for word, with a first name and town. For example Karen, Algonquin. Nothing invented and nothing cleaned up.

What we used

The exact products on this job

Brand, line, colors with codes, sheen, primer, coats. If you want to match it later, this is how.

Paint brand

Which manufacturer we bought for this job.

Product line

The exact line. For example the specific interior or cabinet product used.

Colors and codes

Every color with its code, for example the wall color and the trim color, exactly as written on the can.

Sheen

Sheen per surface. Walls, trim, doors, cabinets.

Primer

Which primer, and where it went. Spot prime or full prime.

Number of coats

Coats per surface, and why that many on this job.

Your house is not this house, but the math works the same way

Run your own number in about a minute, or call David at (847) 553-1726 and ask about a job like this one.